AgroWatts
Agrivoltaic project types (30–1,000 panels)
Project types
What we design and build
Examples of configurations AgroWatts quotes for farms and agro-industry: from 30 to 1,000 modules, with solar, batteries (BESS), irrigation and rainwater harvesting. These are illustrative project types, not completed projects or real clients.
Solar pumping for wells & irrigation
Growers with deep wells or booster pumps (9-CU/9-N, PDBT or GDMTO tariffs).
- Typical size
- 30–120 modules
- ≈ 19–77 kWp
- Indicative investment (PV only)
- MXN 0.3 M–MXN 1.9 M
- Illustrative ISR tax shield
- ≈ MXN 0.1 M–MXN 0.5 M
Includes
- Grid-tied PV or direct solar pumping
- Pump drive / controller
- Drip irrigation and soil-moisture sensors
- Optional rainwater harvesting
Berries & protected agriculture with cold storage
Berry, vegetable or flower farms with cold rooms and packing (GDMTO/GDMTH).
- Typical size
- 150–400 modules
- ≈ 97–258 kWp
- Indicative investment (PV only)
- MXN 1.6 M–MXN 6.5 M
- Illustrative ISR tax shield
- ≈ MXN 0.7 M–MXN 1.8 M
Includes
- Elevated agrivoltaic structure over the crop
- BESS for cold room and night loads
- Precision irrigation + rainwater from modules
- Microclimate monitoring
Agro-industry, packing & processing
Sugar mills, packers, farms and plants with high medium-voltage demand (GDMTH).
- Typical size
- 400–1,000 modules
- ≈ 258–645 kWp
- Indicative investment (PV only)
- MXN 4.4 M–MXN 16.1 M
- Illustrative ISR tax shield
- ≈ MXN 1.8 M–MXN 4.5 M
Includes
- PV on elevated structures, roofs or adjacent land
- BESS for backup and critical loads
- Cistern and rainwater harvesting
- Interconnection < 0.7 MW AC (CFE procedure 360)
Off-grid or weak-grid ranch
Livestock ranches and orchards with no grid or frequent outages.
- Typical size
- 30–200 modules
- ≈ 19–129 kWp
- Indicative investment (PV only)
- MXN 0.3 M–MXN 3.2 M
- Illustrative ISR tax shield
- ≈ MXN 0.1 M–MXN 0.9 M
Includes
- PV microgrid + LFP batteries
- Pumping for troughs and irrigation
- Electric fencing, lighting and refrigeration
- Critical-load management
CFE interconnection
Distributed Generation < 0.7 MW AC needs no CNE permit; we handle CFE procedure 360 (Ventanilla Energía).
Tax shield
100% immediate deduction (Art. 34-XIII Income Tax Law) if the equipment operates ≥ 5 years. Confirm with your accountant.
Solar + BESS + water
Power for irrigation, cooling and processing; batteries for the night; rainwater harvested on module surfaces.
Illustrative figures using 645 W reference modules and the 2026 band of MXN 17–25k/kWp (central ~23k). BESS, civil works and interconnection are quoted separately. Shield = investment × 30% (general corporate rate). Systems under 25 kWp are assessed as a minimum package. Not a quote.